For the best experience, open QuoteLens on a desktop or laptop.
AI-Powered Contractor Quote Analysis

The smarter way to
hire a contractor.

Compare quotes side by side, spot red flags, and negotiate with confidence — before you sign a thing.

Start for Free →View Demo

The average contractor quote has a 23% pricing variance

On a $200,000 project, that is $46,000. QuoteLens pays for itself on your first quote.

Start Saving Today →
HOW IT WORKS

From PDFs to Decision-Ready
Insights in Minutes

Upload your contractor quotes and let AI do the heavy lifting.

01
COMPARE
Side-by-Side Quote Comparison
Every line item across all contractors, color-coded to instantly surface the lowest and highest prices.
Line Item
Coastal
$36,256
Sunshine
$27,252
LOWEST
Gulf Coast
$52,666
Timeline6 weeks from permit5-6 weeks from April 20257 weeks from permit; start Apr 14
Warranty2yr workmanship; 1yr tileNot specified3yr workmanship; 2yr tile; 10yr membrane
LicenseCGC1528847CBC1265901CGC1521334
LINE ITEMS
Plumbing$6,620$4,200$6,200
Electrical$3,200$2,850$4,100
Drywall$2,400$1,950$2,800
Flooring$5,103$2,304$6,525
Cabinets & Millwork$5,130$3,780$9,720
Appliances$900$1,880
Painting$2,400
Tiling$8,603$5,248$13,540
Permits & Fees$1,850$1,800$2,200
Other$950$4,220$5,701
TOTAL$36,256$27,252$52,666

🟢 Lowest   🔴 Highest

02
ANALYZE
AI Strengths & Red Flags
Claude reads every quote and surfaces what each contractor does well — and what should give you pause.
COASTAL CONSTRUCTION GROUP
Mid-range pricing with solid warranty (2-year workmanship)
Premium Kohler/Delta fixtures included — no hidden costs
Detailed line-item breakdown; easy to understand scope
Tile-specific warranty (1-year lippage/cracking coverage)
Quartz countertops and full kitchen tile allowance included
SUNSHINE STATE BUILDERS LLC
Lowest total cost: $27,252 (25% below Coastal; 48% below Gulf Coast)
Competitive timeline (5-6 weeks)
Includes dishwasher and range hookup
Demolition breakdown is transparent ($2,900)
Master bath vanity included (48")
GULF COAST CUSTOM HOMES
Highest quality materials: Italian 24×48 porcelain, Benjamin Moore Aura, Schluter premium systems
Best warranty package: 3yr workmanship + 2yr tile + 10yr Schluter membrane
Performance guarantee: $200/day credit if not complete in 7 weeks
Includes 5% contingency reserve ($2,901) — professional risk management
Daily site management and full dust barriers — minimizes disruption
03
QUANTITY CHECK
Scope & Quantity Discrepancy Scanner
AI flags hidden scope gaps, missing line items, and variance spikes that price comparisons alone won't catch.
14
CRITICAL
0
REVIEW
0
ALIGNED

Top concern: Sunshine State excludes permits and fixtures from base estimate, artificially lowering apparent cost. Major scope differences exist across all contractors on fixture grades, cabinet construction, waterproofing, and tile specs.

Line ItemCoastalSunshineGulf CoastVarianceInsight
🔴Plumbing – Rough & Finish$6,620$4,200$6,20057.6%Sunshine excludes fixture supply (owner-supplied); Coastal includes Kohler/Delta mid-range ($1,200 allowance); Gulf Coast includes premium fixtures + tankless water heater rough-in.
🔴Electrical$3,200$2,850$4,10043.9%Gulf Coast includes panel upgrade and LED recessed lighting ($4,100); others do not. Sunshine lowest at basic GFCI/hood/under-cabinet only.
🔴Drywall & Painting$2,400$1,950$2,80043.6%Gulf Coast specifies premium Benjamin Moore Aura with full skim coat; Coastal does patch/skim/prime + 2 coats; Sunshine patches only affected areas.
🔴Flooring – Materials & Prep$5,103$2,304$6,525183.2%Coastal includes Schluter DITRA membrane ($1,680); Gulf Coast includes waterproofing + larger format tile (24×48). Tile size varies: Coastal 24×24/12×24, Sunshine 18×18/12×12, Gulf Coast 24×48.
🔴Cabinets & Millwork$5,130$3,780$9,720157.1%Gulf Coast includes master bath double vanity 72-inch custom ($3,600). Semi-custom inset dovetail at $340/lf vs Coastal at ~$285/lf vs Sunshine stock at $210/lf.
🔴Kitchen Sink & Faucet$780$520$1,140119.2%Gulf Coast specifies Kohler Vault undermount + Purist faucet ($1,140); Coastal Kohler undermount + Delta pull-down ($780); Sunshine drop-in style ($520). Fixture quality differs significantly.
🔴Tiling – Labor & Installation$2,975$2,240$4,950121%Gulf Coast at $11/sf premium large-format with epoxy grout; Coastal/Sunshine at $7-9/sf basic set/grout. Gulf Coast labor significantly higher for premium installation methods.
🔴Master Bath Shower Rebuild$4,200$3,600$5,80061.1%Coastal includes custom tile surround with niche and linear drain ($4,200); Sunshine shower pan/fixtures basic ($3,600); Gulf Coast custom with dual niches, bench, Schluter linear drain ($5,800).
🔴Master Bath Vanity$2,100$1,400$3,600157.1%Gulf Coast 72-inch custom double vanity with quartz ($3,600); Coastal 60-inch soft-close quartz ($2,100); Sunshine 48-inch standard top ($1,400). Size and quality differ significantly.
🔴Countertops – Quartz$3,696$3,108MISSING18.9%Coastal & Sunshine list kitchen countertops separately (Calacatta 3cm); Gulf Coast rolls countertop cost ($3,108 @ $74/sf) into Tiling line item ($13,540). Line item organization obscures scope.
🔴Demolition & Haul-off$3,800$2,900$4,40051.7%Gulf Coast includes dust barriers and full protection ($4,400); Coastal full demo ($3,800); Sunshine basic demo ($2,900). Coastal quotes demo in 'Other' section — should be separate line.
🔴Permits & Fees$1,850$1,800$2,20022.2%Sunshine notes permits NOT included in base estimate (owner responsible). Coastal/Gulf Coast include permits. Sunshine's base cost artificially low if permits must be added separately.
🔴Project Management & Cleanup$950$420$1,400233.3%Gulf Coast includes daily site supervision + detail cleanup ($1,400); Coastal cleanup/walkthrough ($950); Sunshine final cleanup only ($420). Project oversight scope differs significantly.
🔴Contractor Fee / ContingencyMISSING$2,965$2,9012.2%Sunshine includes 10% contractor fee ($2,965) in total; Gulf Coast includes 5% contingency reserve ($2,901). Coastal does not break out fee or contingency separately — potentially hidden in other line items.

🔴 Critical = 20%+ variance or missing scope  ·  14 items flagged across all contractors

04
DECIDE
Recommendation & Negotiation Leverage
A clear winner with a tailored negotiation playbook to maximize your savings.
AI RECOMMENDATION — WINNER
COASTAL CONSTRUCTION GROUP
$36,256 represents the optimal balance of quality, cost, and warranty protection. At $9,004 more than Sunshine State (26% premium) but $16,410 less than Gulf Coast (31% savings) — Coastal provides premium Kohler/Delta fixtures, 2-year workmanship warranty, quartz countertops, and transparent line-item pricing that eliminates surprises.
HOW MUCH YOU COULD SAVE
Choose Sunshine State over Coastal
$9,004 (25% discount)
— but sacrifices warranty & quality
Choose Coastal over Gulf Coast
$16,410 (31% savings)
— best value proposition
Choose Sunshine State over Gulf Coast
$25,414 (48% savings)
— maximum budget constraint
FINAL ASSESSMENT
Best Value (Cost + Quality + Warranty)
Coastal Construction Group
Best Budget Option
Sunshine State Builders (requires warranty negotiation)
Best Premium Option
Gulf Coast Custom Homes (if budget permits)
Lowest Risk
Gulf Coast Custom Homes (comprehensive warranty + performance guarantee)

The Problem

Why Comparing Construction Quotes Is So Hard

Contractor quotes rarely follow the same format. One contractor includes demolition. Another lists it separately. A third leaves it out entirely. Some include materials. Others include only labor.

Without careful comparison, you may be evaluating apples vs oranges. That's where costly decisions happen.

How It Helps

How QuoteLens Helps You Decide

Smart Quote Comparison

Instantly view contractor quotes side-by-side, even when they use completely different formats.

AI-Assisted Analysis

Automatically identifies missing items, scope gaps, and unusual pricing patterns across all quotes.

Negotiation Intelligence

Know exactly where you have leverage before you pick up the phone or sign anything.

Who It's For

Who Uses QuoteLens

Homeowners

Renovations, remodeling projects, and major home improvements.

Real Estate Investors

Flips, rental rehabs, and construction budgeting across multiple properties.

Property Developers

Review and compare contractor proposals quickly, at scale.

Contractors & Consultants

Evaluate competing bids and surface scope differences for your clients.

Simple, transparent pricing

Cancel anytime. No hidden fees.

Free

Try it on your first project

Free
Get Started Free
1 project
3 quotes per project
1 AI analysis
Basic Excel export
Compare view
Combined analysis
Priority support
MOST POPULAR

Pro

For homeowners & investors

$19/mo
Start Pro
Unlimited projects
Unlimited quotes
30 AI analyses/month
Compare view
Combined project analysis
10 quantity checks/month
Full Excel export
BEST VALUE

Business

For flippers & contractors

$49/mo
Start Business
Everything in Pro
Unlimited AI analyses
Unlimited quantity checks
Custom export templates
Priority support
Early access to new features

One mistake in a contractor quote can cost thousands.

Catch it before you sign.

FAQ

Frequently asked questions

QuoteLens

© 2026 QuoteLens™. All rights reserved.

Terms of ServicePrivacy PolicyAI DisclosureContact